建筑机电设备,一般由各专业设计人员各自布置管线和出图,缺乏系统的协调与平衡,致一些设备及管线会在建筑平面、立面位置上相互交叉发生冲突,甚至影响建筑物的正常使用。为避免这种现象,通过对建筑机电设备的布置进行综合设计,既满足各专业技术要求,又使建筑机电设备管线合理布置,以保障工程质量,降低工程施工成本。
Construction machinery and electrical equipment, generally by the professional designers of their respective layout of pipelines and plans, the lack of coordination and balance of the system, some of the equipment and pipelines will be in the building plane, facade location of the intersection of conflict, and even affect the normal use of the building . In order to avoid this phenomenon, through the comprehensive design of the layout of mechanical and electrical equipment, not only meet the technical requirements of each professional, but also make the mechanical and electrical equipment pipeline reasonable layout to ensure the quality of the project and reduce the construction cost.