论文部分内容阅读
一、建筑结构及采暖方式密得威斯特钢厂新建成的冷轧车间由八个相互平行的建筑物所组成,其大部分是相邻而且相通的,占地面积约79,000米~2。车间总宽度为206米,全长为750米,如把每个建筑物一个接一个的话,其总长度约为2.15公里(见图1)。设计采暖通风系统有几个主要目的,首先是夏季与冬季向整个车间连续不断地供室
First, the building structure and heating methods The newly-built cold-rolling workshop at Midwest Steel consists of eight buildings that are parallel to each other, most of which are adjacent and interconnected, occupying an area of about 79,000 meters-2. The workshop has a total width of 206 meters and a total length of 750 meters. If each building is built one by one, its total length is about 2.15 kilometers (see Figure 1). There are several main purposes for the design of heating and ventilation systems. The first is the continuous supply of room to the entire workshop in summer and winter.