论文部分内容阅读
7月的宜昌,酷暑难当。三峡工地各工作面如一个个冒着热气的“大蒸笼”,蒸得人喘不过气来。为了反映广大三峡建设者为工程建设战高温、斗酷暑的感人事迹,《中国三峡工程报》派出文字和摄影记者,分别到各施工现场采访,准备做一些系列报道。这是一个报道生产施工单位“战高温夺高产”的常规话题。记者们避开以往只盯着建设者们冒着高温挥汗如雨、加班加点夺高产的常规写法.而从单位管理层科学组织安排施工计划,错开不利施工的高温时段,把
Yichang in July, unlucky. Three Gorges site of the face such as steaming one by one “big steamer,” steamed people breathless. In order to reflect the touching stories of the construction work of the Three Gorges Project for those who are fiercely warmed and have a hard time, the “China Three Gorges Project” dispatched texts and photojournalists to interview each construction site and prepare for some series of reports. This is a regular topic covered by the production and construction unit “fighting high temperatures and winning high output.” The reporters avoided the conventions of staring at builders only in the past and spent too much time on high-yielding overtime work, and arranged the construction plans from the management of the unit scientific organizations, staggered the unfavorable high-temperature construction period,