龙河梯级水电一期开发工程芭蕉滩水库、石板水电站(引水式)在近20年来三上未成。水电工作者根据变化了的社会经济情况,论证、调整为一期开发石板水电站(混合式),同时优化了流域规划。由于调整后的一期工程占地少,投资省,减少了上下游矛盾的协调,而很快立项并建成发电。上游藤子沟水利枢纽、下游鱼剑口电站是全流域梯级滚动开发的主要水电工程,现正充分发掘石板水电站的启动能力,发挥电站所在地方和电网的积极性,加速促进其滚动开发目标的实现,为振兴重庆经济增添力量。
Long River cascade hydropower development project Bajiao Tan Reservoir, Shiban Hydropower Station (water diversion) in the past 20 years on the three unsuccessful. According to the changed social and economic conditions, hydropower workers demonstrate and adjust their plans to develop the Slate Hydropower Station (hybrid) in the first phase and optimize the basin planning. Since the adjusted phase I project occupies less land and saves investment, the coordination of upstream and downstream contradictions has been reduced, and the project has been quickly completed and power generation completed. The upper Tousizigou Water Control Project and the downstream Yujiankou Hydropower Station are the major hydropower projects in the cascade rolling development of the whole basin. They are now fully exploiting the start-up capability of the Slate Hydropower Station, exerting the enthusiasm of the local power stations and the power grids, accelerating the realization of their rolling development goals, To revitalize Chongqing economy add strength.