论文部分内容阅读
肥城兴隆煤矿主井和风井两立井工程,因地质情况复杂,施工中发生三次突水,本文介绍该三次突水情况、条件及所采取的综合治理措施。
Due to complicated geological conditions and three water inrush occurred in the construction of the main well and the shaft of Feicheng Xinglong Coal Mine, this paper introduces the conditions and conditions of the three water inrush and the comprehensive treatment measures adopted.