京九铁路平湖南编组站工程是铁道部、广东省和深圳市的重点工程,也是大京九铁路最后一个大型配套项目。它占地1997亩,投资6亿多元。建成后,对于完善京九铁路大动脉的配套设施,促进特区经济的发展和迎接香港“九七”回归等,具有重要的政治经济意义。承担主体工程建设的广铁集团工程总公司自1996年2月正式开工以来,以顽强拼搏的精神,争创国优的信心,投入精兵强将,日夜奋战,创造了前所未有的施工奇迹。日前,记者就工程建设的组织实施及进展等情况,采访了平湖南编组站指挥部指挥长彭德威。 据介绍,该编组站主体工程包括路基土石方、桥涵、辅轨、铺岔、驼峰、信号、通讯、电力、给排水等十几个分项,还有编组站、机务所、站修所房建工程8万平米,总体设计为两级四场,全部采用微机自动化控制编解,是一项多功能、多专业、现代化的系统工程。总工期为22个月,(按建设部正常施工定额测算需52个月完成,)而其中仅广铁工程总公司承担的土石方工程量就达770万立方米,超过了该公司的最高年产量。整个工程要求在香港“九七”回归前初步形成规模,1997年底建成,工期紧,难度大。为此,广铁工程总公司组建了平湖南编组站指挥部,由具有丰富实践经验的总公司主管生产的副总经理彭德威担任指挥长,抽调优秀的
The Beijing-Kowloon Railway Pinghu Marshalling Station Project is a key project of the Ministry of Railways, Guangdong Province and Shenzhen City, and it is also the last large-scale supporting project of the Grand Beijing-Kowloon Railway. It occupies an area of 199 acres and invests more than 600 million yuan. After completion, it will be of great political and economic importance to improve the supporting facilities of the major arteries of the Beijing-Kowloon Railway, promote the economic development of the SAR, and welcome the return of Hong Kong to the “97”. Since the official construction of the Guangzhou Railway Group Engineering Co., Ltd., which undertook the construction of the main project, with the spirit of tenacious struggle, we have been striving for the confidence of Guoyou, invested in elite troops, and worked hard day and night to create an unprecedented construction miracle. A few days ago, the reporter interviewed Peng Dewei, commander of the command headquarters of the Pingxiang Hushua Marshalling Station about the implementation and progress of the construction of the project. According to reports, the marshalling station main project includes subgrade earth and stone, bridges and culverts, auxiliary rails, paving, hump, signal, communication, electricity, water supply and drainage and more than a dozen sub-items, as well as marshalling station, maintenance office, station repair house building. With 80,000 square meters of engineering, the overall design is two-level and four-field, all of which are programmed with microcomputer automation. It is a versatile, multi-disciplinary, and modern system engineering. The total construction period is 22 months (calculated in accordance with the normal construction quota of the Ministry of Construction in 52 months), of which the only amount of earth and stone work undertaken by Guangzhou Railway Engineering Corporation is 7.7 million cubic meters, which exceeds the company’s maximum annual output. . The entire project requires the initial formation of a scale before Hong Kong’s return to the “97”. It was completed at the end of 1997 and the construction period was tight and difficult. To this end, Guangzhou Railway Engineering Corporation established the headquarters of the Pinghu Marshalling Station, and Peng Dewei, deputy general manager in charge of production at the head office with rich practical experience, served as the commander.