论文部分内容阅读
据《Теплоэнергетика》2013年8月刊报道,乌拉尔联邦大学的专家拟定了汽轮机装置冷凝器管更换期限论证的方法。提供了汽轮机装置冷凝器管系更换期限估算方法所确定的结果。在更换期限统计估值时,对于汽轮机运行过程中被堵死的冷凝器管,使用期限被认为是已知的(全部工作时间),而对于汽轮机修理时被堵死的管子,使用期限被认为是难以预料的(审查后整理)。在修理时被堵死管子的数量和在汽轮机运行过程中被堵死管子数量之间的比值决定了管系更换期限估
According to the August 2013 issue of “Теплоэнергетика”, experts from the Urals Federal University have prepared a method for demonstrating the expiration date of condenser tube replacement for steam turbine installations. Provides the results of a method of estimating the period of replacement of the condenser piping of a steam turbine plant. At the time of replacement of the deadline statistics, the service life of the condenser tubes blocked during the operation of the steam turbine is considered to be known (full working time), whereas for tubes that have been blocked during the repair of the turbine, the service life is considered Is unpredictable (review after finishing). The ratio between the number of tubes blocked during repair and the number of tubes blocked during turbine operation determines the period of line replacement