华能上海石洞口第一电厂(原上海石洞口发电厂)系我国“七五”期间重点能源建设工程项目,全国特大型企业,上海电网第一座超百万容量的现代化港口电站,装有4台国产30万千瓦改进型发电机组。该厂于1982年4月开始筹建,1985年3月1日开始打桩,并采用一次规划设计、连续施工安装的方式建设。1987年12月18日1号机组并网发电,至1990年5月
Huaneng Shanghai Shidongkou First Power Plant (formerly Shanghai Shidongkou Power Plant) is a key energy construction project during the “75” period in China. It is a large super-large-scale enterprise in China and the first modern one-million-capacity port power station in Shanghai Power Grid. There are 4 domestic 300,000 kilowatts of improved generating units. The plant began construction in April 1982, piling began on March 1, 1985, and adopted a planning and design, construction and installation of continuous construction. December 18, 1987 No. 1 unit grid-connected power generation, to 1990 May