论文部分内容阅读
中国电力工业利用外资始于1979年,世界银行提供贷款建设云南鲁布革水电站,成为中国电力行业利用外资的首例。经过近20年的发展,利用外资的规模不断扩大,利用外资的方式和渠道逐步多样化,从而弥补了国内电力建设资金的不足和国产发电设备供应能力的缺口。随着国际经济一体化的趋
Utilization of foreign capital in China’s electric power industry began in 1979, and the World Bank has provided loans to build the Yunnan Lubuge Gehydropower Station, becoming the first case of utilizing foreign capital in China’s power industry. After nearly 20 years of development, the scale of the utilization of foreign capital has been constantly expanded and the ways and channels for utilizing foreign capital have been gradually diversified, thus making up for the lack of funds for domestic power construction and the gap in the supply capacity of domestic power generation equipment. With the trend of international economic integration