目前我局各建筑安装单位的施工,除进行冬季施工者外,已全部停止。一年来,经过推行计划管理、计件工资及生产区域管理、一长制等工作,企业管理水平与职工政治思想及业务技术水平已有所提高,这对保证顺利完成今年施工任务起了很大作用。我局今后要担负建设太原工业基地的艰巨任务,绝大多数重点工程都要由我局承担,而这些工程都是规模巨大、结构复杂和技术要求很高的,以我们目前的水平要想承担并搞好今后艰巨复杂的建筑安装任务,显然是有极大困难的,因之,必须充分利用今年的冬闲时间,将各单位的基层干部和特种技工集中进行训练,把他们的思想觉悟与业务技术水平在现有基础上提高一步,以适应国家建设事业的迫切需要。根据上述情况及中建部华北工程管理局和山西省委的指示,特对各单位今年的冬季训练工作作如下安排:(一)我局各单位当前存在的主要问题是:基层领导力量薄弱和职工业务技术水平不高,尤其是厂房建筑和管道安装的经验与技术力量尚十分不足,加以今冬有些工程要进行冬季施工,有些工程要进行明年工程的构件预制,有些工程需要相当数量的木工进行营俱生产,而各单位又都要进行调整机构、结算财务、清理资产、整顿队伍和技术评级等工作。因而今年的冬训工作必须是在保证搞好冬季施工及其它各项工作的同时进行;训练的重点应当是基层干部与特种技术工人。凡是不进行冬季施工的工地主任、工地行政管理干部与技术干部,工长与估算、计
At present, the construction work of the construction and installation units of our bureau has all stopped except for the winter construction workers. In the past year, after the implementation of program management, piece-rate wages and production area management and one-long system, the level of enterprise management and the political ideology and business skills of staff and workers have been raised. This has played a significant role in ensuring the successful completion of this year’s construction task . In the future, the Bureau will shoulder the arduous task of building an industrial base in Taiyuan. The vast majority of key projects are to be undertaken by the Bureau. These projects are large-scale, complicated structures and high technical requirements. At present, And to do a good job in the arduous and complex construction and installation tasks in the future, it is obviously extremely difficult. Therefore, it is necessary to make full use of this year’s winter leisure time to concentrate the grass-roots cadres and special mechanics of all units in training and put their ideological awareness and business The level of technology is one step forward on the existing basis to meet the urgent needs of the country’s construction. Based on the above and instructions from North China Construction Management Bureau and Shanxi Provincial Party Committee of China Construction Ministry, the following special arrangements are made for winter training in all units: (1) The main problems currently existing in all units of our bureau are: weak grassroots leadership and staff The technical level of business is not high, especially the experience and technical strength of plant buildings and pipelines installation is still not enough. Some winter winter construction projects should be carried out this winter. Some projects will carry out prefabrication of components for next year’s projects and some projects require a considerable number of carpenters to carry out camps All production, and all units have to be adjusted institutions, financial settlement, asset clean-up, rectify the ranks and technical ratings and other work. Therefore, the winter training work this year must be carried out at the same time as ensuring good winter construction and other various tasks; training should focus on grassroots cadres and special skilled workers. Any construction site without the winter director, cadres and technical cadres of construction sites, chief of staff and estimates, total