论文部分内容阅读
为了认真贯彻落实华主席抓纲治国的战略决策,保证铁路运输生产,保护职工安全健康,深入开展“工业学大庆”的群众运动。我局卫生科组织了西安、宝鸡、西韩、勉西、铁疗和中心,宝鸡两个防疫站有关人员,组成协作小组,对工务部门道岔电焊工进行了调查,现将体检情况总结于后; 一、劳动条件和劳动卫生调查简况我们于一九七七年三月份对全局各工务部门九个电焊车间进行了卫生调查。在九个电焊车间中仅一个工务段电焊车间宽大符合要求外,其余工务段电焊车间均不合要求,车间狭小,焊台设置甚密。其中四个车间有抽风排毒设备,其余均无。对有焊接道岔任务的六个工务段进行了有害气
In order to conscientiously implement Chairman Hua’s strategic policy of grasping the basic state governing the country, ensure rail transport production, protect the safety and health of workers, and carry out the mass movement of “Daqing in industry”. Bureau of Health, Bureau of Health organized the Xi’an, Baoji, West Han, Mian Xi, iron treatment and center, Baoji two epidemic prevention station staff to form a collaborative group, the welder of the work department turnout survey conducted, the physical examination is summarized in the post ; I. Brief Introduction to Labor Conditions and Labor Hygiene Survey We conducted a health survey of nine welding workshops in various public works departments in March 1977. Only one of the nine welding workshops in the utility division welding shop generous meet the requirements, the remaining sections of the welding workshop are not required, the workshop is small, the welding set is very close. Among them, four workshops have exhaust detoxification equipment, the rest none. Hazardous gas has been applied to six work sections that have the task of welding turnouts