摩尔根·克利克电站的6号机组,容量为50万瓩,蒸汽参数为175.5公斤/厘米~2和538℃/538℃。1966年6月17日摩尔根·克利克6号机组拼入电网。从签订合同到安装完毕仅花了25个月,到投入运行才27个月,因此是50万机组中突出的例子。1966年8月底曾带到满负荷,并于同年10月正式投入运行。拖迟带满负荷的原因是由于其他部件,而不是由于蒸汽锅炉本身。该机组于16.5至53.5万瓩负荷运行情况非常良好。并且可以容易地以每分钟2.5万瓩的速率递减或递升负荷。在7.5至16.5万瓩范围内亦可运行,且可通过精确改善的控制凋节以提高运行性能。经过广泛的性能试验说明锅炉全部符合甚至超过每项设计以及运行的技术要求,到目前为止尚未发生过由于受压部件或性能本身而引起任何的被迫停炉。
Unit 6 at Morgan Klick Power Station has a capacity of 500,000 瓩 with steam parameters of 175.5 kg / cm ~ 2 and 538 ° C / 538 ° C. June 17, 1966 Molgen Klick on the 6th unit into the power grid. It took only 25 months from the signing of the contract until the installation was completed, and was only 27 months before it was put into operation, making it a prominent example of 500,000 units. At the end of August 1966, it was brought to full load and officially put into operation in October of the same year. The reason for delayed loading is due to other components, not to the steam boiler itself. The unit operated very well from 16.5 to 535,000 tons. And can easily decrease or ramp up at a rate of 25,000 每 per minute. Operating in the 7.5 to 165,000 瓩 range can also be run, and through improved control of the withered section to improve operational performance. Extensive performance tests have shown that the boilers all meet or exceed the technical requirements of each design and operation and so far no forced shutdown has occurred as a result of pressured parts or performance itself.