论文部分内容阅读
一、概况:该索道的线路设备和生产工艺参考国内外有关资料,综合优点,先后进行了三种不同的结构的试验,经历了五次失败,三次大的修改,经过两个多月反复试验,群策群力,终于试验成功,不管在结构和工艺性能上达到国内先进水
First, an overview: The cable line equipment and production processes with reference to relevant information at home and abroad, the overall advantages, has conducted three different structures of the test, has experienced five failures, three major changes, after more than two months of repeated testing , Team work, finally successful test, regardless of the structure and process performance to reach the domestic advanced water