水电工程超概算的主要原因有设计漏项和变更;施工单位多算工程量、高套定额;建设工期延长;建设征地和移民安置费用增加;建设单位管理费大幅度提高等。为此,提出控制超概算应从加强设计阶段的造价管理,加强对施工单位的监督管理,约束建设单位等3个方面的进行控制,以达到控制投资的目的。 The main reason for exceeding the estimated budget of hydropower projects is the omission of design items and changes; the construction units are more than the amount of construction projects, high set quotas; extension of construction period; land acquisition and resettlement costs increase; construction unit management fees increased significantly. Therefore, it is proposed that the control over budget should be controlled from the following three aspects: strengthening the cost management in the design stage, strengthening the supervision and management of the construction unit and restricting the construction unit, so as to achieve the purpose of controlling investment.
其他文献
45年前,我出生在新疆兵团农七师一三○团二○连,在这片黑土地上。我读完了中学,参加了工作,在党的培养下,我从一个普通的职工成长为连队的机务站长、工会主席和党支部书记兼
结合英那河水库扩建大坝形体竣工测量,分析了水利水电工程施工测量规范(SL52-93)关于竣工测量一节中对限差的规定,探讨了形体质量评定标准,并建议向业主补充提供形体质量评定
编制森林经营方案的问题,在我国《森林法》的有关条款中已作了明确的规定。这就是说,森林经营方案已经有了法律地位。为了总结经验,推动这项工作的开展,目前,林业部资源司已
开展公路货运电子商务是公路货运发展的大趋势,目前已经采用的各种货运电子商务系统还很不规范,缺乏稳定性和通用性。这里介绍了目前较为先进的自动撮合式公路货运电子商务系统
森林工业的科技进步取决于先进技术装备的应用,生态学角度所允许的并具有经济效益的技术应立足于伐区的基本特征,如林木蓄积、林分组成,单株平均材积,伐区地形、土壤承受能力
上海地铁2号线杨高路~东方路区间隧道为整个地铁2号线工程中先行施工的区间隧道。在实际施工中,采取均衡施工的目标管理制度,日平均推进速度达到8m,另外,盾构成功地穿越了施工
做喜剧要实事求是,笑声就是最实事求是的。汪远的团队是清一色的八零后,八三年出生的他是公司里略微年长的创始人。他的团队里没有资深编剧,国际导演、大牌演员,更像是一个非
你知道吗?在英语中,各种不同外形、不同高度的“房子”说法是不一样的。请你读读下面这些单词,并将它们记在心里吧!house房屋hut茅舍cottage村舍building高楼 Did you know
由于全球气候变暖,气温骤变,以及人类社会发展对自然造成的影响,基于可持续发展战略,在水利工程设计方案中出现了与自然和谐融入式的生态理念。生态理念的运用将在很大程度上
以地质雷达在我省几座隧道工程质量检测方面的应用为例,论述了地质雷达在宏观控制隧道工程质量,并有针对性地采取措施以及消除工程质量隐患等方面的应用可行性。 Taking the