论文部分内容阅读
为适应教学需要,我院从国外引起一套彩色闭路电视。今年暑假新教学楼竣工后,即将原有六个教室的小教学楼改为电教用房。电教科和后勤施工人员,积极克服任务重、要求高、时间紧的困难,在修配厂、电工房配合下,自己设计、布线、安装,按时完成了整套电力配电线路的安装任务,并安装了空调设备,架设了空调管道,调试安装了闭路电视的本机设备。现安装工作基本完成,并已投入使用。
In order to meet the teaching needs, our institute has caused a set of colored closed-circuit televisions from abroad. After the completion of the construction of the new school building this summer, the original teaching building of the six classrooms will be changed to an audio-visual education room. Electrical education and logistic construction personnel actively overcome the difficulties of heavy tasks, high requirements, and tight schedules. Under the coordination of the repair and electrotechnical houses, they have designed, wired and installed their own, and completed the installation of the entire power distribution line on time and installed it. Air-conditioning equipment, air-conditioning ducts, and commissioning of local equipment installed CCTV. The installation work is basically completed and put into use.