论文部分内容阅读
1工程概况宝泉抽水蓄能电站位于河南省辉县薄壁乡大王庙上游2km的峪河上,距新乡和郑州分别为45km和80km。电站为纯抽水蓄能电站,采用一洞二机形式,安装4台单机混流可逆式水泵水轮机,装机容量1200MW。电站的上水库位于宝泉村东侧的东沟内,大坝为混凝土面板堆石坝,下水库是利用已建成的宝泉水库加高加固而成,坐落在峪河上,大坝为浆砌石重力坝。输水系统连接上、下库,由上库进(出)水口、2条引水主洞、4条引水支洞、2条尾水洞和下库进(出)水口组成。2条引水主洞在离机组中心线上游133.5m处分成4条支洞,每一岔管均采用“卜”
1 Project Overview Baoquan pumped storage power station is located in Hui County, Henan Province, the thin wall Township 2 km upstream of the Valley on the river, from Xinxiang and Zhengzhou, respectively 45km and 80km. The power station is a pure pumped storage power station, with one hole, two machines, and four single-stage reversible pump turbines installed with a installed capacity of 1200MW. The upper reservoir of the power station is located in Donggou within the eastern side of Baoquan Village. The dam is a concrete faced rockfill dam. The lower reservoir is constructed by strengthening and consolidating the completed Baoquan Reservoir. It is located on the Yuhe River and the dam is masonry Stone gravity dam. The water delivery system is connected to the upper and lower reservoirs, and is composed of an upper inlet and an outlet, two primary diversion holes, four diversion branch holes, two tail tunnels and a lower inlet and outlet. The two main diversion tunnels are divided into 4 branch holes at 133.5m upstream of the center line of the unit, each branch pipe adopts “BU”