锡林郭勒盟地质队自1956年山地上采用了小水平工程以来,质量低劣——弯曲的现象非常严重,如有的水平竟打成蛇形,也有的一个水平从两端掘进,歪达24度之多。因此,歪得最少的是半个掌子面,多的达一个、二个、甚至于三个掌子面,因此,弯曲非常严重,仅因此,有的一个长十八米七的水平,就浪费工作量三米之多。据3756工区1957年施工的小水平不完全的统计,就浪费了工作量达50公尺,计贰千玖佰伍拾元。这样不仅浪费了国家财产,而且因水平弯曲,影响了地质成果和工作效率。当时虽曾几次想解决这一问题,但是由于强调科学仪器,而没有依靠老工人,
The Xilinguole Geological Team has been of poor quality since its introduction to small-scale projects on the mountain in 1956 - the phenomenon of bending is so severe that snake-like shapes are sometimes found, while others are drilled through both ends at a level of 24 degrees many. Therefore, the least distortion is half the face of the face, one or two more, or even three facets. Therefore, the bending is very serious, and as a result, there is a long 18 meters and a half Wasting three meters of workload. According to the incomplete statistics of the small-scale construction of the 3756 work area in 1957, a work load of 50 meters was wasted, accounting for two thousand nine hundred dollars. This not only wastes the national property, but also affects the geological achievements and work efficiency due to the horizontal curve. Although several times at that time tried to solve this problem, due to the emphasis on scientific instruments, instead of relying on old workers,