一、模板系统采用整体吊装支模一九八○年,我公司开始试用组合钢模板时,采用单块直接组装的工艺。这种施工工艺,劳动强度大,效率低,组装工效仅达0.8平方米/工日;同时,高空作业多,实现安全生产难度也较大。后来,我们采用了地面组装、整体吊装、一次就位的支模工艺。将高空作业变为地面拼装,组装工效显著提高,平均达4平方米/工日。整体吊装支模,减轻了劳动强度,提高了施工速度,保证了工程质量。我们在墙模板、柱模板、梁模板和楼板模板支模中,都采用了整体吊装工艺。模板
First, the formwork system adopts the integral hoisting formwork In 1980, when our company started to try the combined steel formwork, it used a single piece direct assembly process. This construction process has great labor intensity and low efficiency, and the assembly efficiency only reaches 0.8 square meters/day. At the same time, there are many high-altitude operations, and it is more difficult to achieve safe production. Later, we used ground assembly, integral lifting, and one-shot molding process. The high-altitude operations were converted to the ground and the assembly efficiency was significantly improved, with an average of 4 square meters/day. The integral hoisting support mold reduces the labor intensity, improves the construction speed, and ensures the project quality. We have adopted the integral lifting technology in the wall formwork, column formwork, beam formwork and floor formwork formwork. template