介绍了瑞木镍钴项目高压酸浸工艺反应釜的系统大修内容,结合现有检修规程及前期积累的经验,为日后提高工作效率,保证系统安全运行,指出了相关标准化大修的发展方向。
The system overhaul of high pressure acid leaching process reactor in Ruimu Ni-Co project was introduced. Combined with existing maintenance regulations and pre-accumulated experience, the paper pointed out the development direction of standard overhaul for improving work efficiency and ensuring the safe operation of the system in the future.