论文部分内容阅读
2012年,全院核安全情况是:在役核设施安全运行,未发生上等级核事件;在建核设施进展有序;总体核材料处于严密监管之下,未发生丢失与被盗事件。1在役核设施101堆2012年根据反应堆安全停闭期特点,严格执行《重水研究堆安全关闭期运行维护、监测规程》和有关规程,维护反应堆系统、设备,保持系统的可用性和可靠性。日常加强重水储存间
In 2012, the nuclear safety of the hospital was: safe operation of nuclear facilities in service, no top-grade nuclear incidents occurred; progress in the construction of nuclear facilities under construction; overall nuclear materials under strict supervision and no loss or theft occurred. 1 In-service nuclear facilities 101 heap In 2012, according to the characteristics of the safe shutdown period of the reactor, the system strictly complied with the Operation, Maintenance and Monitoring Procedures for the Safety Shut-Off Period of Heavy Water Research Reactor and relevant regulations to maintain the availability and reliability of the reactor system and equipment. Daily heavy water storage room