论文部分内容阅读
挂篮悬臂施工,重点在于挂篮系统的安全可靠,难点在于各个节段挂篮施工过程中的动态控制。而这些要求监理人员与其它工程参建方技术人员密切联系、相互配合,严格履行关键工序、隐蔽工程联合报验、多方共同签认手续,以一种高度的责任心来对待每一个悬浇块体,认真定期开展对挂篮系统、悬浇节段的测量与监控,施工中加大对检测数据的采集、分析力度,使悬臂连续梁桥成型以后满足设计要求,最终确保工程总体施工质量。
Hanging basket cantilever construction, the emphasis is on the safe and reliable hanging basket system, the difficulty lies in the various sections of the hanging basket construction process of dynamic control. These requirements supervisors and other project participants in the construction of technical staff in close contact with each other, the strict implementation of key processes, concealed project joint inspection, multi-sign the formalities, with a high degree of responsibility to treat each of the suspended cast We should carry out the measurement and monitoring of the hanging basket system and suspension pouring section regularly and increase the collection and analysis of testing data during the construction so as to meet the design requirements after forming the cantilever continuous beam bridge and finally ensure the overall construction quality of the project.