长江航运的现在与未来

来源 :中国远洋航务 | 被引量 : 0次 | 上传用户:lzc5812286
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The shipping capacity on the mainstream of the Yangtze River, China’s longest waterway, reached 795 million tons last year, rating one of the most tapped rivers among the world’s inland rivers. The handling capacity of ports along the river’s mainstream reached 650 million tons in 2005. The total throughput included 78 million tons of cargo in foreign trade and 2.6 million TEUs of containers, said JinYihua, director of the Yangtze River Navigation AffairsAdministration. The throughput on the mainstream was only 400 million tons in 2000. The Chinese government attaches great importance to improving the navigation con- ditions of the Yangtze. Expanding navigation on the river has been prospering areas along the mighty river. Currently, the Yangtze is flanked with metallurgical, power, chemical, auto, building materials and machinery industrial belts, along with more than 20 state-level economic and technological, and high-tech development zones. The ship- ping capacity of the river’s mainstream is expected to amount to 860 million tons this year, with the handling capacity of its ports topping 750 million, including 90 million tons of cargo in foreign trade and 3.1 million TEUs of containers, according to its navigation authorities. Navigation on the Yangtze is easier as the navigation course is wider and deeper thanks to water storage in the Three Gorges reservoir. With improving navigation conditions, ships will sail on the Yangtze more safely and their speed can increase by about 20 percent, adding navigation costs would be cut by 30 percent for per ton-kilometer. Seven provinces and two municipalities along the Yangtze make up 41 percent of China’s total economic overall strength and the shipping capacity on the Yangtze accounts for 80 percent of the total shipping capacity of China’s inland rivers, according to statistics from the Ministry of Communications. The Three Gorges Project was launched in 1993, and was scheduled to be completed by 2009. The Three Gorges Project, including a 2309-m-long, 185-m-high dam with 26 power generators, is expected to generate 84.7 billion kwh of electricity annu- ally when it is completed. It is also expected to control flooding on the Yangtze, fuel industrial growth in the area and improve shipping. The shipping capacity on the mainstream of Yangtze River, China’s longest waterway, reached 795 million tons last year, rating one of the most tapped rivers among the world’s inland rivers. The handling capacity of ports along the river’s mainstream reached 650 million tons in 2005 . The total output included 78 million tons of cargo in foreign trade and 2.6 million TEUs of containers, said JinYihua, director of the Yangtze River Navigation AffairsAdministration. The throughput on the substantial was 400 million tons in 2000. The Chinese government attaches great importance to improve the navigation con- ditions of the Yangtze. Currently, the Yangtze is flanked with metallurgical, power, chemical, auto, building materials and machinery industrial belts, along with more than 20 state-level economic and technological, and high-tech development zones. The ship- ping capacity of the river’s mai nstream is expected to amount to 860 million tons this year, with the handling capacity of its ports topping 750 million, including 90 million tons of cargo in foreign trade and 3.1 million TEUs of containers, according to its navigation authorities. Navigation on the Yangtze is easier as the navigation course is wider and deeper thanks to water storage in the Three Gorges reservoir. With improving navigation conditions, ships will sail on the Yangtze more safely and their speed can increase by about 20 percent, adding navigation costs would be cut by 30 percent for per ton-kilometer. Seven provinces and two municipalities along the Yangtze make up 41 percent of China’s total economic overall strength and the shipping capacity on the Yangtze accounts for 80 percent of the total shipping capacity of China’s inland rivers, according to statistics from the Ministry of Communications. The Three Gorges Project was launched in 1993, and was scheduled to be completed by 2009. The Three GorgesProject, including a 2309-m-long, 185-m-high dam with 26 power generators, is expected to generate 84.7 billion kwh of electricity annu- ally when it is completed. It is also expected to control flooding on the Yangtze, fuel industrial growth in the area and improve shipping.
其他文献
每一个时代,都有属于它的经典诞生.每一个经典,都是一段让人难以忘怀的传奇.在中国重卡发展历史上,不同时期都会有经典车型诞生,它们的横空出世,成为各时期最能体现行业精髓
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
布鲁氏菌可在人和牲畜间传染,所引发的布鲁氏菌病具有人畜共患特点.被布鲁氏菌感染的动物如果怀孕将会流产,未孕则会导致不孕不育,布鲁氏菌感染引发的疾病将会导致畜牧业遭受
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
全球经贸形势的持续看好,刺激了集装箱海运需求强劲攀升.班轮市场供求关系的改善,使得船公司在承托双方的博弈中,再次拿到了市场竞价的主动权.5月份,国际集装箱班轮运输业需
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1.她小时候是很喜欢过年的,每到岁末,心里就开始盘算着离过年还有几天。越来越薄的日历纸是她越来越浓的欢欣和期待。  后来她对过年不自觉地有了厌倦和抵触。女人过了25岁,对“年”是会畏缩不安的。就这样心惊肉跳到30岁,反倒又会轻松起来。似乎大限已过,又会有新一轮的精彩。  从25岁到30岁的五年间,她结婚,出国,婚变,回国……走了千万里路,心情早已变得淡泊。一个女人的命运其实是认识自己手里有什么,什
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥