长干1号隧道是交通部典型示范工程黄塔(桃)高速公路控制工程,隧道跨度大,安全质量和环保要求高,技术复杂。隧道右线进口段埋深浅,地面横坡较陡,围岩松散,地质条件差,多次发生坍塌、冒顶事故。采用密排超前管棚与地表深孔预注浆相结合,给开挖提供棚架支撑,加固松散土体,防止开挖中掌子面垮塌,并灵活采用双侧壁导坑法、中壁法、环形留核心土开挖法等不同开挖方法、浅埋偏压施工技术和监控量测新技术,确保施工质量与安全。
Changan-1 tunnel is a typical demonstration project of the Ministry of Transportation Yellow Tower (peach) highway control project, the tunnel span, safety and quality and environmental protection requirements, technical complexity. Tunnel entrance right section buried depth, steep ground slope, rock loose, poor geological conditions, repeated collapse, roof collapse accident. The combination of close-packed tube shed and deep hole pre-grouting on the ground surface provides scaffolding support for excavation and reinforces loose soil so as to prevent collapse of the face during excavation. The double-wall pilot pit method is adopted flexibly and the middle wall Law, ring leaving the core soil excavation excavation method, such as different excavation methods, shallow bias construction technology and monitoring measurement of new technologies to ensure the construction quality and safety.