上海华东电业管理局总调科技情报楼工程(下简称华电大楼)88HC内爬塔在离地近100m的小屋面上拆卸过程,是一个在特定施工条件下高位拆除内爬塔的实例。一、工程概况和内爬式塔机拆除条件华电大楼地处在上海闹市的南京东路上,基地面积为1952m~2,大楼占地面积1443m~2,主立面紧沿南京东路一侧,其他三面均与原有商店和居民建筑邻接,基地形成三面封闭,施工可用场地狭小,建材运
The East China Electric Power Administration’s General Scientific and Technological Information Building Project (hereinafter referred to as the Huadian Building) 88HC inner tower is an example of dismantling the inner climbing tower under high-level conditions under specific construction conditions. I. Project Overview and Demolition of Tower Cranes Huadian Tower is located on Nanjing East Road in downtown Shanghai, with a base area of 1952m~2, a building footprint of 1443m~2, and the main facade closely along the side of Nanjing East Road. The other three sides are adjacent to the original shops and residential buildings, the base is formed on three sides, the construction available space is small, and the construction materials are transported.