马耳他马尔萨什洛克港防波堤工程位于地中海马耳他岛的东南海岸,是马耳他共和国投资新建的项目,于1979年委托我国设计施工。 马耳他岛受地中海季风影响,每年10月下旬至次年4月大风出现的频率高,平风间隙时间短,一般风力都在3级以上。风浪的不利因素使施工现场的海上工作日每年仅为153天,陆上工作日每年约为214天,对防波堤的施工影响很大。
Malta Marsaxlokk Harbor breakwater project is located on the southeast coast of the Mediterranean island of Malta, the Republic of Malta investment in the new project, commissioned in 1979, China’s design and construction. Affected by the Mediterranean monsoon, Malta Island has a high frequency of wind gusts from late October to April each year, with short wind clearance time and generally wind above Class 3. The unfavorable factors of wind and waves make the working day at sea only 153 days a year at sea and about 214 days a year onshore, which has a great influence on the construction of breakwaters.