我省2003年南部退耕还林工程规划中,太行山区和冀东山区造林132.6万亩,占总任务的41.4%,其中,荒山匹配造林67.8万亩。随着工程建设规模的急剧扩大,匹配荒山造林成活率低、进度慢的问题已经凸现为退耕还林工程实施的难点,同时也成为各级林业部门着力解决和关注的重点。地处太行山中部的临城、满城两县在实施退耕还林过程中,采取高程扬水、引水上山的做法,给我们带来解决荒山匹配造林成功的希望。
In the planning of the project of converting farmland into forests in southern China in 2003, the planting area in the Taihang Mountains and the Jidong Mountains was 1.326 million mu, accounting for 41.4% of the total. Of the total, 67.8 million mu were afforested with barren hills. With the rapid expansion of construction scale, the problem of slow survival rate of matching afforested barren hills has been highlighted as a difficult point in the implementation of the project of converting farmland into forestry and has also become the focus of efforts and concerns of the forestry departments at all levels. Located in Lincheng in the middle part of Taihang Mountain, Mancheng County and two counties in implementing the project of converting farmland to forests have adopted the idea of elevating water level and diversion to the mountains, which has brought us hope to solve the success of matching afforestation and barren hills.