马脊梁矿是个开采几十年的老矿,1958年改造为小斜井。1968年以来,由于设计采区采完,在边生产、边勘探、边设计的情况下,对矿井进行第二次改建,直到目前,供电、通风、排水、运输和地面建筑仍在改建中。就是在这种情况下,广大职工以党的基本路线为纲,坚持安全生产、实现稳产高产。自中央(70)71号文件下达以来,近五年时间,年年超额完成国家计划。今年上半年又分别提前17天和35天完成了产量和掘进进尺国家计划,实现了双过
Ma Ridge Mine is a mining of old mines for decades, 1958 transformed into a small incline. Since 1968, due to the completion of the design mining area, the mine has been rebuilt for a second time in terms of production, exploration and design. Until now, power supply, ventilation, drainage, transportation and ground construction were still undergoing alterations. It is in this situation that the majority of workers take the party’s basic line as the key link, insist on safe production and achieve steady and high-yielding. Since the issuance of document No. 71 of the Central Committee of the CPC (70), over the five-year period, the state plan has been over-fulfilled. In the first half of this year, they completed the national plan of production and the measure of tunneling 17 days and 35 days in advance respectively, realizing double