【摘 要】
:
Drill and blast is a commonly used method for rock slope excavation in hydropower engineering. During blasting excavation of rock slopes, far-field vibration monitoring on the first upper berm for statutory compliance is usually performed to control the b
【机 构】
:
School of Civil Engineering and Architecture,Nanchang University,Nanchang 30031,China;School of Reso
论文部分内容阅读
Drill and blast is a commonly used method for rock slope excavation in hydropower engineering. During blasting excavation of rock slopes, far-field vibration monitoring on the first upper berm for statutory compliance is usually performed to control the blast-induced rock damage to the final slope face. In this study, for the rock slope excavation in the Jinping-I hydropower station, the field vibration monitoring and acoustic testing are presented to investigate the vibration characteristics on the first upper berm and the damage depth in the current bench. The relationship between the PPV on the first upper berm and the PPV damage threshold on the damage zone boundary is also studied through three-dimensional FEM simulations. The results show that on the first upper berm, the maximum vibration velocity component occurs in the vertical direction. While on the blasting damage zone boundary, the horizontal radial vibration velocity is the maximum component. For the Jinping-I slope with a bench height of 30 m, the radial PPV on the inner side of the first upper berm is 2.06% of the PPV threshold on the damage zone boundary. This ratio is increased as the bench height decreases. Therefore, the bench height of the rock slope is an important factor that cannot be ignored in determining the allowable vibration velocity for rock damage control.
其他文献
文章逐个分析计算了单摆的摆角、摆球的自转、摆线质量、空气浮力以及空气阻力对于单摆周期的影响,以1m长5°小幅单摆为例,得到这5种因素带来的系统相对误差分别为+0.45‰、+0.02‰、-0.45‰、+0.07‰、-0.14‰,合计仅为-0.05‰,即这5种误差因素几乎相互抵消,小幅单摆实验在理论上的系统误差极小.文章给出了较为详细的推理、计算和分析过程,尤其空气阻力矩的推理过程以及图、表等,意在提供较为完整和准确的认识.文末,针对人们在空气阻力认识上可能存在的某些不足,文章给出了几点必要的说明.
在教学过程中加强课程思政教育具有重要意义、势在必行.为了深化大学物理课程教学改革,在混合式教学模式下,借鉴传统教学针对达成知识目标的有效教学方法,对课程思政进行教学设计.通过线上、线下、考核“三位一体”的思政设计与实践,结合期末课程思政名师讲座提升,初步形成课程思政育人模式.该模式应用以第一章“质点力学”为例,实践表明课程的育人质量得到提升.
本文推导了硬币在不同环境下的基本运动方程,分析了硬币的绕圈运动问题,并利用其结果讨论了两种特殊的运动模式,最后用计算机模拟的方法进行了验证.
本文在电磁感应法的基础上,通过与亥姆霍兹线圈串联使电容达到谐振的改进方法,测量了不同电容参数下的亥姆霍兹线圈磁场分布,并利用Origin软件拟合分析了亥姆霍兹线圈磁场与中心轴线位置的关系.实验结果表明,基于电磁感应的改进方法测得的亥姆霍兹线圈磁场精确度在一定程度上均大于传统电磁感应法的测量结果,3种电容选择中,串联电容为0.099×10-6 F时,精确度最高,拟合的亥姆霍兹线圈磁场与中心轴线位置的关系式与理论状态下的公式基本吻合.改进方法的实验效果明显,精确度高,科学可行,是一种值得推广的测量亥姆霍兹线圈
To study the dynamic response of vertical and batter pile groups in saturated sand, dynamic tests of these pile groups in saturated sand were carried out using the ZJU400 geotechnical centrifuge at Zhejiang University. The following results were obtained.
本文利用价格低廉的1310 nm商用光纤分束器、铝箔导热等对光纤温度传感器实验装置进行了改进,并测量了改进后传感器的温度系数,发现改进后的温度系数更加稳定,导热条件对温度系数的测量影响较大.最后对此实验的教学提出了建议.
This paper aims to investigate the critical stability of a multi-degree-of-freedom (multi-DOF) real-time hybrid simulation (RTHS). First, the critical time-delay analysis models are developed using the continuous- and discrete-time root locus (RL) techniq
It is difficult to conduct shaking table tests that require large-displacement high-frequency seismic excitation due to the limited capacity of existing electrohydraulic servo systems. To address this problem, a double-layer shaking table (DLST) is propos
The challenge in the practical application of rocking foundations is the estimation of its performance, particularly the rotation angle, during a strong earthquake. In this study, the dynamic rocking behavior for a shallow foundation considering structura
In recent years, special attention has been given to the effects of underground spaces and structures on the seismic response of adjacent ground. Nevertheless, to the best of the authors\' knowledge, no method has yet been considered to reduce these eff