1 事故经过1996年6月10日10时左右,某县 电力服务总公司修试部继保班,在水北 变电站对10kV水北线173开关进行跳 闸事故后检查,检查结果须做CT一次通 流试验。为了察看工作条件,修试部副主 任周××走至开关柜后面查看。约10时 20分左右,在没有办理任何许可手续的 情况下,周叫副值班工谢×× 打开173 开关柜后下网门。谢问周:“要干什么?”, 周说:“要看一下”。谢告诉周:“水北线 173线开关在检修,线路侧和10kV母线 侧带电”。周回答说:“我知道”。接着谢和 周走到173线开关柜后面。在开门时谢 还对周说:“里面带电能不能开?”。周答: “能,没事”。于是谢就把下网门打开。开 完下网门后,谢再次交代周:“里面有电,
1 Accident After 10 o’clock on June 10, 1996, a county electricity service company repair department following the insurance classes, in the North Substation 10kV Shui North Line 173 switch tripping after the inspection, the test results to be done CT pass Flow test. In order to observe the working conditions, repair department deputy director Zhou × × walked to the back of the switchgear view. About 10:20 or so, in the absence of any permit procedures, Zhou called deputy duty Xie × × open the door after the switchgear 173. Thank you, Zhou: “What do you want?” Zhou said: “Take a look.” Xie told Zhou: “Water North Line 173 line switch overhaul, line side and 10kV bus side live.” Zhou replied: “I know.” Then Xie and Zhou walked behind the 173 line switchgear. When opening the door, she also said to Zhou: “Can the electric charge be opened inside?” Week A: “Yes, nothing.” So Xie put the next door open. Open the next door, Xie once again account for the week: "There is electricity,