论文部分内容阅读
在360M2烧结机系统的电气生产中一些重大设备的故障停机或者信号报错停机会直接造成重大的生产事故,针对现阶段存在的问题,我们在停机检修中针对重大设备的相应问题进行程序优化与改造。经过长期的研究,从实际出发结合以往经验,我们创新应用双点测温技术,趋势采集技术应用,程序块完成监控的目的,完成电气设备的升级改造。
In the 360M2 sintering machine system electrical production of some major equipment failure or signal error will stop a direct result of major production accidents, in view of the current problems, we stop the maintenance of major equipment for the corresponding problems in the process of optimization and transformation . After long-term research, starting from the actual situation combined with past experience, we apply innovative dual-point temperature measurement technology, the application of trend acquisition technology, the monitoring of the completion of the program block to complete the upgrading of electrical equipment.