红水河岩滩水电站位于广西红水河中游的巴马、都安两县交界的岩滩河段上,属一项大型工程,是红水河上目前正在施工的第三个梯级电站。坝址座落在辉绿岩上,而水库区则分布约占区域面积60%的碳酸盐岩,因此,水电站的建设必须考虑岩溶渗漏的工程地质问题。 在初步设计之初,分析前人工作成果,经过勘测研究,结合卫片、航片解译,首先确定了
Hongshuihe Yantan Hydropower Station is a large-scale project located at the Yantan River section at the junction of Bama and Du’an Counties in the middle reaches of Hongshui River in Guangxi. It is the third large-scale project currently under construction at Hongshuihe River. Dam site is located on the diabase, while the reservoir area is distributed about 60% of the area of carbonate rocks, therefore, the construction of hydropower station must consider the karst leakage engineering geological problems. At the beginning of preliminary design, the analysis of previous work results, after investigation and study, combined with satellite films, aerial film interpretation, first identified