Optimal Operation for Baoying Pumping Station in East Route Project of South-to-North Water Transfer

来源 :Chinese Journal of Mechanical Engineering | 被引量 : 0次 | 上传用户:lovedengdai
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China.Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm.For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day.The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes(namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%?31.27%.Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%?5.79% by the schemes of adjusting blade angles when pumping certain discharge. Baoying pumping station is a part of source pumping station in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation is established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are determined at different periods of time in a day.The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operating schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge, the electrical cost is saved by 4.73%? 31.27 % .Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%? 5.79% by the schemes of adjusting blade angles when pumping certain discharge.
其他文献
金代定都北京后,永定河防洪问题成为元明清三代的大事。为了确保京城安全,明清两代特别重视永定河的治理。其中,康熙三十七年(1688年)于成龙主持的永定河全面治理成为划时代
《国家税务总局关于发布〈适用增值税零税率应税服务退(免)税管理办法〉的公告》(国家税务总局公告2014年第11号,以下简称《公告》)规定,自2014年1月1日起,中华人民共和国境
目的研究苏木Caesalpinia sappan的化学成分。方法利用正相硅胶柱色谱、Sephadex LH-20、反相硅胶柱色谱及反相制备液相色谱等手段进行分离纯化,并通过1H-NMR、13C-NMR等波谱
一天又一天流转的岁月,我不再是风采少年和青春已作别。还在耳边争吵那几只多嘴的麻雀,转身却再也找不到那只粉红的蝴蝶。我们从不曾说分别,如今你成为别人的体贴。只剩下回忆在
为了寻找抗肿瘤先导化合物,在微波辅助下,以肉桂酰氯与α-羟基膦酸酯为原料,设计合成了12个新化合物,经IR、~1H NMR、~(13)C NMR及元素分析进行结构确认。采用MTT法对目标化
The suspended sediment transport equation and its near-bed sediment flux are one of the key problems of sediment transport research under nonequilibrium conditi
心情好了,自然行走如风。付出汗水,换来五谷丰登。天地轮回,风调雨顺,随遇而安,四季都有风景。身体好了,乐享健康长寿,家庭和睦,自然万事俱兴。爱人爱己,荣宠不惊,心怀感激,就会幸福一生
糖尿病黎明现象的诊治进展广东省深圳市人民医院(518020)徐晨王新民本文综述了糖尿病黎明现象的诊断、鉴别诊断和发病机理以及治疗进展。清晨高血糖是糖尿病(DM)控制不良的主要表现,也是影
目的:研究小檗胶滴眼剂对糖尿病性白内障的防治作用。方法:链脲佐菌素(StreptozotocinSTZ)诱发的大鼠糖尿病性白内障模型,以小檗胺滴眼剂进行防治实验。动物分为预防和治疗两个实
输卵管妊娠是一种常见的妇科急腹症 ,对妇女造成极大的危害 ,诊断不及时甚至可危及生命。近 2 0年来全世界异位妊娠的发病率均有显著增加 ,发生率增长了 2~ 3倍。我国部分地区