论文部分内容阅读
The construction of China’s first digital natural gas pipeline—Jining Branch of the West-East Gas Pipeline—has been accelerated completely.Up to May 8, the accumulative welded length of whole line exceeded 612 km, more than two thirds of the total leng
The construction of China’s first digital natural gas pipeline-Jining Branch of the West-East Gas Pipeline-has been accelerated completely. Up to May 8, the accumulative length of the whole line exceeded 612 km, more than two thirds of the total leng