民用建筑通风空调安装工程在整个建筑中具有设备多、能耗大、管道占据空间大等特点。如在水冷式中央空调系统中,风管遍布于各空调房间,水管道均采用闭式循环,这对安装的质量提出了更高的要求。若处理不当,势必影响到系统功能的实现,制冷制热达不到设计要求,违背了舒适性空调设计的初衷。为确保空调设计目标的实现,必须在安装全过程中,严格按照设计要求及GB50243-2002的要求进行质量控制。本文就通风空调工程安装施工过程中的质量控制问题进行分析,旨在保证施工质量以及后期的使用。
Civilian building ventilation and air conditioning installation project in the entire building with more equipment, large energy consumption, pipeline occupy a large space and so on. As in the water-cooled central air conditioning system, the air duct throughout the air-conditioned rooms, water pipes are closed loop, which put forward higher quality requirements of the installation. If handled improperly, is bound to affect the realization of system functions, cooling and heating can not meet the design requirements, contrary to the original intention of comfort air conditioning design. In order to ensure the realization of the design goal of air conditioning, quality control must be carried out strictly in accordance with the design requirements and requirements of GB50243-2002 during the whole installation. This article analyzes the quality control problems in the process of installation and construction of ventilation and air conditioning project, in order to ensure the construction quality and the later use.