改造设备 秦皇岛港第二港务公司为充分发挥国家“六五”重点工程投资效益,从根本上解决机械设备老化、故障频繁问题,依靠广大工程技术人员,拟定大胆、科学方案,周密计划,充分准备,开始对煤码头一期工程翻、堆、取、装一线进行大修。 该公司每年承担所在港50%以上的煤炭中转任务。其中,煤码头一期工程每年完成1200—1300万吨(超设计能力20—30%)。该工程机械设备为我国自己设计、自己制造、自己安装,工艺水平、自动化程度在80年代初期处于领先地位。1983年12月投产以来,累计中转煤炭1.19亿吨,创利润3.6亿元,折旧费提取额达原值的80%。其主要关键基础件已经老化,无法进行正常生产。为从根本上扭转被动局面,这个公司充分发挥广
Reconstruction Equipment Qinhuangdao Port Second Harbor Company to give full play to the national “Six Five” key project investment returns, fundamentally solve the mechanical equipment aging, frequent failure, relying on the majority of engineering and technical personnel, to develop a bold, scientific plan, well planned, fully prepared , Began to turn over the first phase of the coal terminal, heap, take, install a front-line overhaul. The company undertakes more than 50% of the coal transit tasks in its port every year. Among them, the first phase of the coal terminal completed 1200-1300 tons per year (over design capacity of 20-30%). The construction machinery and equipment for our own design, manufacture their own, installation, technology level, the degree of automation in the early 80s in a leading position. Since it was put into operation in December 1983, a total of 119 million tons of coal has been transshipment, a profit of 360 million yuan, and an amount of depreciation expense of 80% of the original value. Its main critical components have been aged, unable to carry out normal production. To fundamentally reverse the passive situation, this company give full play to Canton