论文部分内容阅读
中国水利电力对外公司(以下简称中水电公司)在承包泰国巴帕南水闸及附属建筑物工程中,通过高水平的经营管理,向国际市场展示了先进的管理水平。同时,他们大胆探索,在与国际经营管理接轨方面进行了积极的有益尝试。 位于泰国洛坤府巴帕南境内的巴帕南水闸及附属建筑物工程,是泰国国王御批的巴帕南流域开发规划中的龙头项目。其目的是拦成蓄淡,改善该地区土壤条件,以利农业生产和相机泄洪。工程主要包括水闸及附属建筑物工
China Water Power International Corporation (hereinafter referred to as China Hydropower Company) demonstrated its advanced management level to the international market through the high level of operation and management in the contracting of the Babangan Sluice and ancillary buildings in Thailand. At the same time, they boldly explored and made positive and beneficial attempts in connection with international business management. The Papanui Sluice and ancillary buildings, located in Papanao, Nakhon Si Thammarat Province, Thailand, are the leading projects in the development of the Papanan River Basin approved by the King of Thailand. Its purpose is to stop the flood and improve soil conditions in the area to facilitate agricultural production and flood release. The project mainly includes sluices and ancillary buildings