剪力墙结构整支整浇施工工艺加快了高层住宅施工速度,提高工具周转率,节约成本,为快捷施工带来了便利条件。整支整浇与先浇筑剪力墙后浇筑顶板的施工工法相比速度快、效率高。随着施工工艺的提高,整支整浇施工工艺在保证整体质量的前提下,砼的外观效果也很美观,降低了人力和物力的投入,产生了良好的经济效益和社会效益。1特点、难点(1)该施工工艺便捷、可操作性强,可提高施工效率,缩短工期,工具周转率高。(2)整支整浇避免了二次接茬带来的接茬砼蜂窝、麻面、漏浆、涨模等现象。
Shear wall structure of the whole pouring construction process to speed up the construction of high-rise residential construction, improve tool turnover, cost savings, for the convenience of construction facilitated conditions. The whole pouring pouring and pouring roof after the construction of the first shear wall construction method compared to speed, high efficiency. With the improvement of construction technology, under the precondition of ensuring the overall quality, the entire external wall pouring construction technology has the appearance of beautiful appearance, reducing the input of manpower and material resources, resulting in good economic and social benefits. 1 Features, Difficulties (1) The construction process is convenient and operability, can improve the construction efficiency, shorten the construction period, high tool turnover rate. (2) The whole pouring to avoid the second stubble stubble then stubble stubble concrete honeycomb, Ma surface, leakage slurry, up mode and so on.