惊悉中央水电部通告广西桂平大洋河水库二副坝于1983年2月13日晴天垮坝。笔者曾先后两次赶赴大洋河水库现场调查二副坝垮坝的原因。一、大洋河水库的概况大洋河水库属一座多坝型的引水围堰式中型水库,于1966年动工兴建,1974年竣工。该水库有三座主坝,十五座副坝,共十八座大坝组成。全长4.04公里。最高坝22米(主坝),副坝最高14.2米(15副坝),引水渠全
I was shocked to learn that the Central Ministry of Water and Electricity had informed the Guangxi Yangping Guiyang Dayanghe Reservoir, the second dam, of damming on February 13, 1983. The author has twice rushed to the Dayanghe Reservoir to investigate the cause of the second dam dam. I. Overview of the Dayanghe Reservoir The Dayanghe Reservoir is a multi-dam type diversion cofferdam medium-sized reservoir that was built in 1966 and completed in 1974. The reservoir has three main dams, fifteen auxiliary dams and a total of 18 dams. The total length of 4.04 kilometers. The maximum dam is 22 meters (the main dam), the auxiliary dam is the highest 14.2 meters (15 dams), the diversion canal