煤矿风井井筒中管路非明火安装施工

来源 :建井技术 | 被引量 : 0次 | 上传用户:blueeyes
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新集二矿风井井筒直径 6 .0m ,井筒中风速为 8.5m/s,沼气浓度 0 .3% ,淋水量 5 .5m3/h。在矿井不停产条件下 ,采用非明火作业 ,在该井筒中安装 1趟瓦斯抽放管路。施工中采取增加托管梁层数、加大托架与井壁锚杆螺栓联接孔尺寸、使用自行设计的可折叠式吊盘等措施 ,加上严密的施工组积和监督 ,用 1 0d时间便完成了井筒中管路的安装 ,工程质量全优 ,安全无事故 ,为类似条件下的井筒装备安装施工积累了经验 The new set of two mine shaft diameter of mine shaft 6. 0m, the wellbore wind speed is 8.5m / s, biogas concentration 0.3%, the amount of water 5 .5m3 / h. In the mine without stopping production conditions, the use of non-open flame operation, install a gas drainage pipe in the wellbore. In the construction, the measures such as increasing the number of trusteeship girders and increasing the size of bolting holes between the bracket and the shaft wall, using the self-designed collapsible hanging plate and other measures, together with strict construction compilation and supervision, shall be carried out within 10 days The completion of the wellbore pipeline installation, the whole project excellent quality, safety and accident-free, for similar conditions, installation and construction of wellbore equipment has accumulated experience
其他文献
微器件装配技术是微机械的关键技术之一,本文从微器件装配系统的特性和功能出发,提出了一套用于微装配的微操作系统设计方案,并对系统各个组成部分进行分析,介绍了系统实现的方法
随着数控技术不断发展 ,以单片机控制、数码管显示、步进电机进给为代表的数控系统 ,其简单的功能 ,较低的控制精度及可靠性 ,已无法满足用户日益增长的需求。早期用直流伺服
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
数据通过数控软件,这是确保按设计机床运行的重要手段传送到机床控制系统.本文简要介绍数控软件的设计和应用,即设计软件和设计方法.在此基础上,它着重于实现通信技术和数据
小龙虾即克氏螯虾,在人工养殖条件下,也容易发生疾病,常见的主要有以下6种。1.黑鳃病主要病状:该病主要是由池水污染严重、虾鳃丝受真菌感染所致。病虾鳃丝由肉色变为褐色或
枣树是一种易种好管的重要经济树种,适应性强,生长范围广,成活率高。我市多年植枣,积累了一些高产经验,现介绍如下:一、合理间作枣园间作油菜、绿豆、黄豆等作物,间作种植前
一个城市的发展不仅仅体现在城市的经济发展水平,更体现在城市环境质量上,城市环境问题日益突出和明显,因此市政府必须加强城市环境卫生问题与市民生存、生活环境和人们身体
“十二五”期间我国将步入城镇化发展的快车道,城镇化率将由2010年的46.6%提高到2015年的52%,此后城镇化率平均每年将提高近1.1个百分点.这意味着在“十二五”期间,我国城镇人
近几年来 ,我国造纸行业因液氯钢瓶管理与使用不当 ,引发的事故频率有上升趋势。我们结合青州造纸股份有限公司、郯城造纸厂等单位的实际经验 ,谈了液氯钢瓶在搬运、贮存、使
期刊