由交通部一航院设计的秦皇岛港煤码头三期工程是一座具有八十年代国际先进水平的煤炭出口码头。1989年建成投产,年出口煤炭3000万吨。本工程有3.5万吨级泊位二个,10万吨级泊位一个,码头全长840米。抛石引堤847米、护岸836米、堆场约22万平方米、容量150万吨,煤炭装卸设备,生产、生活及辅助建筑有翻车机房、中控室、管理办公用房,110千伏变电站等,总建筑面积近6万平方米以及通信、供电、给排水、消防、供热、导航、道桥、商检取制样、环保等设施。
The Phase III project of Qinhuangdao Port Coal Terminal, designed by the First Department of Transportation of the Ministry of Communications, is a coal export terminal with international advanced level in the 1980s. Completed in 1989 put into operation, the export of 30 million tons of coal. The project has 35,000-ton berths two, 100,000 berths, a total length of 840 meters. Dumping stone embankment 847 meters, revetment 836 meters, the yard of about 220,000 square meters, capacity of 1.5 million tons, coal handling equipment, production, living and auxiliary buildings are rollover room, the control room, office space management, 110 kV substation , A total construction area of nearly 60,000 square meters and communications, electricity, water supply and drainage, fire protection, heating, navigation, road bridges, commodity inspection and sample preparation, environmental protection and other facilities.