论文部分内容阅读
文章简述了电声系统在安装工程设计中,应当注意与剧场土建工程的密切配合,使整个电声系统更加完善、合理。这种配合包括扬声器孔洞位置的预留,电声系统控制室位置的确定和装修。其次概述了电声系统的供电和防止舞台照明可控硅调光系统的干扰以及电声系统中的管线工程等重要问题。
The article outlines the electro-acoustic system in the installation of engineering design, should pay attention to theater and civil engineering works closely with the entire electro-acoustic system is more complete and reasonable. This cooperation includes the location of the speaker hole reserved, electro-acoustic system control room to determine the location and decoration. Followed by an overview of the power supply of the electroacoustic system and the prevention of the interference of the stage lighting thyristor dimming system and the pipeline engineering in the electroacoustic system.