小湾大坝为目前已建的世界最高双曲拱坝,工程建设难度大,监测项目众多。本文详细介绍了小湾水电站蓄水位升至1225m时近坝库岸变形体监测数据及大坝各监测项目的数据变化情况,通过与往年同一水位下的监测数据的对比分析来判断大坝整体的安全运行情况,为类似工程安全稳定分析评价提供了科学依据。
The Xiaowan Dam is the world’s highest double curvature arch dam that has been built so far. It is difficult to construct the project and has many monitoring projects. This article details the monitoring data of dam deformation body near the dam when the water level of Xiaowan Hydropower Station rises to 1225m and the data variation of each monitoring project of the dam. By comparing with the monitoring data under the same water level in previous years, the dam overall The safe operation of the project provides a scientific basis for the safety and stability analysis and evaluation of similar projects.