在CRTⅠ和CRTⅡ无砟轨道高速铁路技术中无砟轨道钢筋混凝土底座板需先在制梁场制好,运送到工地再进行安装。然后经铣刨机进行表面处理才能达到设计要求。这种施工过程既费时又成本高。而CRT III型无砟轨道技术中钢筋混凝土底座板是在工地现场的路基上直接制做,用料节省、施工便捷、施工工效相对提高,造价相对降低。但其面层需要相应的整平机来对其进行整平提浆以满足高平整度的要求。为满足此需求,研制了轨道底座板混凝土面层整平提浆专用的框架式混凝土整平机。经过现场实际运用检验,工作效率高,使用效果良好。
In the CRT Ⅰ and CRT Ⅱ ballastless track high-speed railway technology ballastless track base plate must be made in the beam system, transported to the site and then installed. Then by milling machine surface treatment to achieve the design requirements. This construction process is time-consuming and costly. The CRT III ballastless track technology in the reinforced concrete base plate is directly on the site of the site construction, material savings, the construction is convenient, the construction efficiency is relatively increased, the cost is relatively reduced. However, its surface needs a corresponding leveling machine to carry out its flattening and raising to meet the requirements of high flatness. In order to meet this demand, we have developed a special frame-type concrete leveling machine for leveling the concrete surface of the rail base plate. After the actual use of the site inspection, high efficiency, the use of good results.