2014年云南电网遭遇了地震、冰雪凝冻、山火、雷电等自然灾害的严重威胁,电网送电通道长期压极限运行,电网安全形势严峻。加之云南电源结构不合理,装机容量远大于需求,电力消纳极为困难。在如此严峻的形势下,电网、电厂在省委省政府的正确领导下,齐心协力、攻坚克难,共同确保了电网的安全稳定运行,保障了全省电力的可靠供应。一、充分认识2015年电网运行的形势——电网安全稳定面临更加
In 2014, Yunnan Power Grid suffered a serious threat of natural disasters such as earthquakes, freezing and freezing of ice, mountain fire and thunder and lightning. Transmission lines of power grids were subject to long-term pressure limiting operation, and the power grid security situation was grim. Coupled with Yunnan power structure is irrational, installed capacity is much larger than the demand, power consumption is extremely difficult. Under such a severe situation, under the correct leadership of the provincial party committee and government, the power grids and power plants make concerted efforts to tackle major difficulties and work together to ensure the safe and stable operation of the power grid and ensure the reliable supply of electricity throughout the province. First, fully understand the situation of power grid operation in 2015 - the power grid security and stability are facing even more