联合站油水分离过程适应性预测控制系统

来源 :油气田地面工程 | 被引量 : 0次 | 上传用户:sannian
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
油田进入高含水后期开发阶段后,随着采出液含水的增大,联合站的进液量也随之增大,负荷增加。而联合站进液含水波动幅度的大幅度变化,也给联合站油水分离过程的操作增加了难度。联合站油水分离过程是多入多出系统;变量间耦合严重,干扰因素多,系统可控性差,分离过程中可 After the oilfield enters the high water-cut stage of development, with the increase of the water content in the production fluid, the inflow of the joint station also increases and the load increases. However, the drastic change of the fluctuating amplitude of water and moisture in the combined station also adds difficulty to the operation of the integrated station oil-water separation process. The joint station oil-water separation process is a multi-input and multi-output system; the coupling between variables is serious, the interference factors are many and the system controllability is poor. In the separation process
其他文献
谷子适应性强,特别是在干旱条件下,也能获得稳定收成;若在水肥条件较好的条件下,谷子可获得亩产500千克以上的高产.谷子虽然耐旱、耐瘠,但是要实现高产,不仅要满足谷子生长发
期刊
围堰施工是水利施工中的重要部分之一,围堰的主要作用就是在即将修建水利工程的位置开辟出一个排水排土的空间,避免工程施工受到水土的干扰,便于建筑物的建造和基坑的稳定。
期刊
本文通过对荣华二采区10
期刊
近年来随着我国经济水平发展,越来越多的水电站先后建成,对水电站测量技术方面也有了更高要求。目前我国大部分中小型水电站处于施工经验不足的发展阶段。基于此,本文首先对某地区水电站的工程概况进行概述,其次对该水电站的机电以及金属结构安装测量技术方案展开相关分析,再次提出机电安装以及金属结构安装测量技术时的注意事项,最后分析加强该水电站工程安全质量的规范化管理。以期为相关工程提供参考。
在水利水电工程项目建设当中,加强对施工质量的管理和控制至关重要,有利于保证整体工程项目建设的质量。因此,需要明确水利水电工程项目施工质量控制的要点,以便提高施工质量
轴流风机动叶安装角的调节效果是影响风机气动性能和稳定性的重要因素之一.采用数值模拟方法对某两级动叶可调轴流一次风机进行了全三维定常计算,探讨了第一级叶轮单叶片安装
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
目的探讨企业职工不同膳食模式与超重/肥胖、血压、血糖的关系。方法对开封市3 327名企业在岗职工进行膳食调查、体格检查及实验室检查。使用探索性因子分析法构建膳食模式,