论文部分内容阅读
一、问题的提出 对工程项目进行经济效益的评价,有“动态”和“静态”两类方法。“动态法”计入资金的时间价值,但计算复杂,适用于大、中型建设项目;“静态法”未考虑时间价值,较为粗略,但它分析计算较简便,直观性强、容易掌握,适用于中、小型项目的比选以及大、中型项目多方案的初步比选。在初步可行性研究阶段,大型和重大项目其方案比选繁多,为节省人力、物力、时间,可先用“静态法”考察项目的经济效益,以
First, the issue put forward Evaluation of the economic benefits of the project, there are “dynamic” and “static” two types of methods. The “dynamic method” takes into account the time value of funds, but the calculation is complex and suitable for large and medium-sized construction projects. The “static method” does not take into account the time value and is relatively crude, but it is simple and intuitive to analyze and calculate, easy to grasp and applicable Comparison and selection of medium and small projects as well as preliminary comparison and selection of multi-programs for large and medium-sized projects. In the preliminary feasibility study stage, there are many options for large-scale and major projects. To save manpower, material resources and time, the “static method” can be used to examine the economic benefits of the project.