论文部分内容阅读
呼吉尔特矿区是国家级规划矿区,矿区各矿井陆续开工,围绕矿井建设的辅助生产建设逐渐展开,但是,矿区社会服务体系建设略有滞后,应当统一规划,同步建设,逐步建立现代化矿区。
The Huijuel mine is a state-level planning mining area. Various mines in the mining area have been started one after another. Construction around the mine has gradually started. However, the construction of the social service system in the mining area lags behind. Therefore, a unified planning and simultaneous construction should be established to gradually establish a modern mining area.