不同地质条件下TB880E型掘进机掘进参数的选择

来源 :工程机械 | 被引量 : 0次 | 上传用户:whqqqqqqq
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
TB880E型掘进机是我公司1997年引进的,先后在西康线秦岭隧道和宁西线磨沟岭隧道施工中使用,经历了不同的地质条件下的施工。根据经验,我们发现,在施工过程中,根据具体地质情况合理地选择掘进参数对保证施工工期起着十分重要的作用。在此,笔者结合TB880E型掘进机在秦岭隧道和磨 TB880E roadheader was introduced by our company in 1997 and was used in construction of Qinling tunnel on Xikang line and Mogouling tunnel on Ningxi line. It has undergone construction under different geological conditions. Based on experience, we find that reasonable selection of driving parameters according to specific geological conditions plays an important role in ensuring the construction schedule during the construction process. Here, I combined with TB880E roadheader in Qinling tunnel and mill
其他文献
Failures of air tank explosion frequently happened on some ZL50 loaders. Structu re composition and work principle of braking systems of the failed machines are
伴随着社会经济的发展和全球化时代的到来,我国服装行业在经历了改革开放30多年的高速发展后已逐渐步入了“品牌化时代”。服装企业之间的竞争逐渐演变成为了形象与服务的较量
期刊
期刊
期刊
去年冬季,某施工单位使用的同一公司生产的几台ZL50装载机,连续发生三起储气罐炸裂故障,其中一起是在生产厂商进行了储气罐更换后再次发生的。笔者有幸被邀请和生产厂商技术
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
一、规范设计rn在设计中应尽量考虑周全,增加安全储备.混凝土楼板要设计有足够的厚度,使其具有一定的刚度,减少挠度,以杜绝板下挠度过大而产生裂缝.受力筋应尽量设计采用螺纹