论文部分内容阅读
本文通过分析八钢转炉炼钢厂煤气回收现状,结合生产实际进行了控制方法的调整,采用滑模控制法,提高了转炉煤气吨钢回收量。
In this paper, by analyzing the status quo of gas recovery in the steelmaking plant of Baosteel converter, the control method is adjusted according to the actual production and the sliding mode control method is adopted to increase the recovery of tonne of converter gas.