巴蒂亚水电枢纽溢洪道用两扇弧形闸门来控制洪水,每扇闸门的面积为10米~2。图1所示是安装在各自闸门门体背面的液压启闭机。当液压机输供油压时,则活塞杆伸出,由两根等长的锚固在溢洪道两边墩墙上的钢丝绳把闸门提升。用
Bati hydropower hub spillway with two arc gates to control the flood, each gate area of 10 m ~ 2. Figure 1 shows the hydraulic hoist installed on the back of each gate. When hydraulic pressure is supplied to the hydraulic machine, the piston rod extends to lift the gate by two equally long wire ropes anchored to the pier walls on both sides of the spillway. use